Welcome to the Course Maintenance blog for Blackwood Golf Club. The aim of this blog is to inform, educate and update on the work the course staff does to maintain and enhance the playing conditions for the enjoyment of the members. Check here throughout the year to get updates, news and view interesting pictures on what has been happening around the golf course.

Wednesday 15 May 2013

The Start of the Winter Rains?

Our resident kangaroo on the 15th hole

The much cooler temperatures and the 50mm of rain of the past few days is hopefully the start of our normal winter weather pattern. We are currently sitting at @100mm of rain less than our average for this time of year, this obviously means that we need above average winter rains to recharge the bore aquifers and refill our dams in preparation for next summer.

The rain we have recieved has thouroughly washed the recent fairway gypsum application into the profile. Greens have received an application of fungicide to target an outbreak of Dollar spot and Anthracnose that has flared up due to the high disease pressure caused by the warm temperatures and high humidity during the last month.

All greens, tees and surrounds will receive applications of liquid fertilizer and iron in the coming weeks. These scheduled monthly applications are to help to maintain acceptable nutrient levels, colour and aid with disease suppression throughout the winter months.

A second application of pre-emergent product will be applied to fairways to give us further Poa annua control over the next 12-14 weeks. Poa annua that is present will also be targeted with a post-emergent product.

Monday 6 May 2013

April Course News


April 2013
April 2012
average
Rainfall
42 mm
44.5 mm
54 mm
Year to Date
103.5 mm
192 mm
141.5 mm
No. of rain days
7
6
-
Average Temp.
23.5°C
22.1°C
-
Average Humidity
64.2%
61.6%
-

Once again April provided us with a very similar weather pattern to the previous two months; a very dry start to the month with above average temperatures giving us the warmest April in the last seven years, and then some much needed rain at the end of the month which significantly boosted the total for the month. The 25mm of rain that fell on the 21st of April was the biggest single day rainfall that we have received since the 17th of August last year, a period of approximately eight months.

In lieu of a full autumn renovation, this year greens were mini-tined and fertilised with an application of a biologically enhanced organic fertiliser; this will further improve the health, vigour and condition of the sward prior to the start of winter.

Further landscaping works to continue to improve the area at the 11th/15th tee paths have been undertaken, with a large number of positive comments being received from members.
A significant amount of staff time has again been spent on clearing the storm debris generated from the strong winds we received throughout the month.
 Gypsum applied to 1st fairway
An application of @8 tonne/Ha of Gypsum was applied to all fairways using our own machinery and labour. The dry weather at the time of application also meant that we were able to dragmat the gypsum into the fairways straight away meaning less impact on play than in previous years.
Tasmainian Blue Gum at clubhouse prior to maintainence pruning
After maintainence pruning