Welcome to the Course Maintenance blog for Blackwood Golf Club. The aim of this blog is to inform, educate and update on the work the course staff does to maintain and enhance the playing conditions for the enjoyment of the members. Check here throughout the year to get updates, news and view interesting pictures on what has been happening around the golf course.

Friday 6 September 2013

August Weather Data



August 2013
August 2012
average
Rainfall
136.5 mm
107.5 mm
112.5 mm
Year to Date
618.5 mm
739 mm
610.6 mm
No. of rain days
19
17
-
Average Temp.
16.3°C
13.4°C
-
Average Humidity
77.8%
77.5%
-

The above average rainfall we received this month has meant that this winter has exceeded last year and been the wettest since 2004. On top of a very wet July this has meant that the course is now starting to become very wet and boggy in the usual places. The upside of this is that the main dam is now full and overflowing. 

The main emphasis of last month’s workload can be split into two parts –

  • The first two weeks seeing staff concentrate on the removal and clean up of the River red gums approved by the council for removal from the righthand side of the 5th fairway. The stumps were ground out prior to the heavy rains and we are now waiting for the ground to dry out to allow us to complete the clean-up.
  • The second two weeks saw staff working on the tasks needed to drain the two bunkers on the second hole. The works needed to carry out the project were undertaken in the following stages –
Ø  Old sand removed
Ø  Re-grade base of bunker
Ø  Dig out drainage lines (herringbone system)
Ø  Install geofabric liner to base of bunker
Ø  Install drains (100mm slotted ag-drain/stone/shade cloth)
Ø  Add sand shellgrit mix
Ø  Consolidate base and shape/pack faces

Following the Ladies Foursomes Championship, spring greens renovation will be carried out, with coring and sanding of greens on the front nine scheduled for Monday 16th September and the back nine on Tuesday 17th September. All greens are also being scarified as part of the renovation process, with this operation being carried out by a contractor throughout the day on the Monday.

Renovation of tees are also scheduled to be carried out this month, with tees being cored to a depth of 75mm and then oversown and sanded to complete the renovation process.

Fairways will be sprayed for Poa annua that has germinated since the last application of product. Areas of broadleaf around the course will be also continue to be targeted as time permits over the coming weeks